Thermal Insulation and Clinker Finishing in a Single System

Clinker insulation panels combine thermal insulation and a clinker finish in one system. A shorter schedule, a smaller crew and less material waste on site.

How does this change things on the construction site?

Four Specific Differences

What is actually changing in the schedule and on the construction site?

01

One stage instead of two

Insulation and clinker finishing in a single system. You don't need to hire separate crews for insulation and finishing.

02

A smaller crew for the installation

Installing the panels requires fewer people than traditional insulation with plaster.

03

Shorter Installation Time

The steps involving the reinforced base coat, priming, and plastering—along with the time required for them to dry—are eliminated. Installation involves bonding, mechanical fastening, and grouting.

04

Fewer weather-related delays

Work can also be carried out outside the summer season, at temperatures above +5°C.

HOW DOES THE PROCESS WORK?

4 Steps from Inquiry to Completion

01
02
03
04
Quote
You provide us with your investment details, and we prepare a proposal and wholesale prices tailored to the scale of your project.
System Selection
We select the thickness of the insulation and the tile pattern to match the design.
Delivery Schedule
We coordinate production and deliveries according to the construction phases.
Project Delivery
We supply panels and provide technical support for installation.
REQUEST A QUOTE

Get a Project Quote

Fill out the form—we'll call you back or reply within 24 hours.

Consent to Personal Data Processing
Frequently Asked Questions

Questions from Developers

Key Considerations When Planning an Investment with the ThermioPlus System.

WarmBrick — FAQ B2B
Do you offer wholesale prices for investment projects? +
Yes. We set the prices tailored to the scope of the project — The higher the volume, the better the terms. Once you've filled out the quote form, we'll prepare an offer tailored to the number of meters and your schedule.
What does the delivery schedule look like for a large-scale project? +
We manufacture expanded polystyrene custom-made — Thickness and specifications tailored to the project. We coordinate the production and delivery schedule for the panels with the construction phases so that the materials are on-site when they are needed.
What are the thermal insulation parameters (lambda)? +
Insulation is selected on a case-by-case basis, based on thickness 5, 10, 15, 20, or 25 cm — depending on the wall construction and the expected thermal performance. We provide the full technical specifications with the quote.
Do we need a specialized team? +
Installing the panels requires a smaller crew than traditional insulation with plaster — The steps of installing the mesh and applying plaster are omitted. A professional is still needed for installation. We provide installation instructions and technical support.
What is the lifespan and warranty of the facade? +
Clinker is fired just like brick — weather-resistant for decades, with no maintenance required. It eliminates the costs of refreshing the facade during the project’s warranty period. We discuss the warranty details during the quote process.
en_USEN